212 Stuart Street

Client: Commodore Builders and Revere Hotel
Status: Completed
Value: $100K - $500K
Location: Boston, MA

JDC was contracted to perform the demolition of this condemned 3-story brick structure. Location of this structure along this highly congested thoroughfare in Boston. Due to the condition of the structure and site constraints, JDC systematically dismantled the building utilizing hand methods.