40 Trinity Place

Client: Suffolk Construction
Status: Current
Value: $1M - $5M
Location: Boston, MA

JDC Demolition Company was hired by Suffolk Construction to perform the complete demolition of the existing 9 story hotel located at 40 Trinity Place in Boston, MA. The scope of work for this project consisted of total building demolition, asbestos abatement, and the removal of existing slab on grade. JDC utilized Brokk demolition robots to remove one exterior column bay and façade at each floor along Stuart and Trinity down to the 4th floor level. Once completed JDC utilized three high-reach demolition excavators working continuous shifts from Saturday morning until late Sunday night. Challenges with this project included traffic management, pedestrian protection, and demolition over an occupied public garage and attached neighboring buildings.