Client:
Suffolk Construction
Status:
Current
Value:
$100K - $500K
Location:
Worcester, MA
JDC Demolition was contracted by Suffolk Construction to perform the asbestos abatement and demolition of a former MassDOT facility in Worcester. JDC’s scope of work also included the removal of a 150’ tall steel radio tower, utility terminations, temporary construction fencing and erosion control measures.